News & Events

SuperTracker Basic Test

General

 

You want to perform a basic test on the SuperTracker  to check whether it is functional.

 

Procedure

 

 

 

 

 

 

 

 

 

Every controller comes with a basic test job: Test SuperTracker 1 Belt 80pl. It checks that the I/O work (you have loop back output 1-4 to input 1-4) and put a serial loopback tester on port 1.

 

 

All products should show green because no sync-point will be missed, the serial is checked for loopback message.